Articles

Vestas Blames Human Error for V112 Wind Turbine Blade Detachment

Posted by:

Danish wind turbine manufacturer Vestas says that human error in the manufacturing process was behind the 8 September detachment of a blade piece from one of its 3.0 MW V-112 model prototype turbines sited in Lem, Denmark.

More: 
Vestas Blames Human Error for V112 Wind Turbine Blade Detachment

0
  Related Posts