Articles

REpower 5M Turbines Performing Well

Posted by:

Almost one year after final commissioning of the Thornton Bank wind farm in Belgium, REpower Systems AG announced that availability of the six REpower 5M turbines has been consistently above 97% over a period of six months.

See original here: 
REpower 5M Turbines Performing Well

0
  Related Posts