Articles

Chinese Distributed Wind Projects Required to Meet Grid Requirements

Posted by:

China is on track to have approximately 100 GW of installed wind power capacity connected to its power grid by 2015, including 23 GW installed capacity of distributed wind power projects, according to its five-year development plan for 2011 to 2015. Distributed wind power projects typically use small turbines that offset on-site energy consumption.

Read the rest here: 
Chinese Distributed Wind Projects Required to Meet Grid Requirements

0
  Related Posts